Capping Project, Staffordshire
Landfill Projects continue to progressively cap a landfill site in Staffordshire with 1mm geomembrane to ensure compliance of the site permit and to EA legislation.
The works have allowed site tipping operations to continue whilst covering the previously installed waste layers.
Works have been completed in challenging conditions with steep slopes, tight angles and a narrow timeframes.
Works also included ground preparation and pipe boot details of various sizes, working closely alongside gas infrastructure works to allow capping works to progress.