Project Description

Cell Drainage System, Rugby

We were requested by our client Sapphire Energy Recovery to complete the final stages of a Cell Drainage system at Cotesbach Landfill Site

  • Butt Fusion and installation of 650m 225mm HDPE pipe
  • Installation and profiling of Aggregate Drainage Layer to the base of the Cell
  • Trenching and haunching of Aggregates
  • Installation of Drainage Sumps
  • Surveying and provision of all As-built data