Pine Lake Resort, Carnforth LFP have completed the installation of a culvert system Pine Lake Resort, Carnforth. LFP implemented a new culvert system to reduce the risk and impact of flooding to the surrounding lodges. The project included a replacement of a hydraulically inadequate culvert with a box culvert including new upstream and [...]
Rising Pumping Main, Skelmersdale, Lancashire
Gary Baldwin2021-11-18T14:18:24+00:00Rising Pumping Main, Skelmersdale, Lancashire Landfill Projects have successfully installed a rising pumping main to enable the control of water levels in a lagoon whilst ensuring discharge to sewer limits and regulations are adhered to. The system comprises of an 800m pumping main, of which 700m is trenched, and the remaining 100m is [...]
Leachate System Improvement Works, South East Scotland
Julie2020-12-23T13:56:33+00:00Leachate System Improvement Works, South East Scotland Landfill Projects successfully completed leachate system improvement works at a landfill site in the South East of Scotland. Works involved both leachate and MEICA works; • Removal of the existing temporary Leachate Extraction System Pipework and air pumps • Stockpiling of redundant unusable pipework • Installation [...]
Blaguegate – Flexible Generation Plant Construction
Julie2020-12-23T15:20:43+00:00Blaguegate - Flexible Generation Plant Construction Landfill Projects were contracted by Ylem Energy to construct the flexible generation plant compound at Blaguegate, Skelmersdale. Works comprised of:- Excavation, separation and removal of contaminated arisings Construction of bespoke concrete plinths, and bespoke concrete forms to house wooden sleepers in order to accommodate the natural-gas-fuelled generators. Installation [...]
Capping Project, Whinney Hill Landfill, Lancashire
Julie2020-12-17T11:57:21+00:00Capping Project, Whinney Hill Landfill, Lancashire Following on from the successful completion of the 2018/2019 - 23,000m2 1mm geomembrane temporary cap and wind anchorage geotextile installation, Landfill Projects were awarded the 2019/2020 - 15,000m2 1mm geomembrane temporary cap and wind anchorage geotextile works. Works are now finished having been completed in challenging conditions with [...]
GCL Installation, Albion, Derbyshire
Julie2018-11-21T20:16:24+00:00GCL Installation, Albion, Derbyshire Landfill Projects were commissioned by G A Smith to complete the installation of 27,000m² Geosynthetic Clay Liner at Albion Landfill Site. Due to the time of year, the works were scheduled intermittently to coincide with favourable weather conditions. Our highly experienced Lining Division worked closely with our client to ensure [...]
Odour Control Project, Lancashire (Phase 2)
Julie2018-10-23T14:23:41+01:00Odour Control Project, Lancashire (Phase 2) Following works carried out under Phase 1 of this project, one area of site remained susceptible to H²s outbreak. The uncapped area was an extremely steep banking. Lining of the steep descent presented a challenge in terms of designing a method of installation that ensured [...]
Odour Control Project, Lancashire (Phase 1)
Julie2018-10-23T13:20:21+01:00Odour Control Project, Lancashire (Phase 1) Following installation of a Gas Collection System for the site's Gas Operators, we were requested to provide assistance with odour control issues encountered by our client as a result of an aggressive H²s outbreak. We conducted an assessment of the source and current extent of the [...]
Capping Project, Ling Hall, Coventry.
Julie2018-10-20T17:28:15+01:00Capping Project, Ling Hall, Coventry Installation of 27,000m² 1mm LLDPE capping. As part of the ongoing restoration works to Ling Hall Landfill site, Landfill Projects were commissioned by G A Smith to carry out the capping works. 27,000m² 1mm LLDPE Capping. 11No. Gas Well Boot Details. 3No. Concrete Shaft Boot Details. [...]
Landfill Remediation, Loughborough
Gary Baldwin2018-10-22T23:03:16+01:00Landfill Remediation, Loughborough Landfill Projects were contracted by Veolia to complete remediation works to Mount Sorrell Landfill Site, Loughborough, comprising:- Decommissioning and removal of Gas Flare Decontamination and removal of redundant Treatment Plant Installation of new Mains Electric Feed Completion of all Civils work re construction of Compound Diversion of existing Gas [...]