Capping Project, Staffordshire Landfill Projects continue to progressively cap a landfill site in Staffordshire with 1mm geomembrane to ensure compliance of the site permit and to EA legislation. The works have allowed site tipping operations to continue whilst covering the previously installed waste layers. Works have been completed in challenging conditions with steep [...]
TWI Company Accreditation
Julie2020-12-23T13:58:15+00:00TWI Company Accreditation Landfill Projects are one of only a handful of companies to have moved past the ‘Working towards’ TWI Company Accreditation and achieved Full TWI Company Accreditation. The accreditation allows Landfill Projects to continue to be able to undertake landfill geosynthetic lining works in accordance with updated Environment Agency requirements. [...]
Capping Project, Whinney Hill Landfill, Lancashire
Julie2020-12-17T11:57:21+00:00Capping Project, Whinney Hill Landfill, Lancashire Following on from the successful completion of the 2018/2019 - 23,000m2 1mm geomembrane temporary cap and wind anchorage geotextile installation, Landfill Projects were awarded the 2019/2020 - 15,000m2 1mm geomembrane temporary cap and wind anchorage geotextile works. Works are now finished having been completed in challenging conditions with [...]
GCL Installation, Albion, Derbyshire
Julie2018-11-21T20:16:24+00:00GCL Installation, Albion, Derbyshire Landfill Projects were commissioned by G A Smith to complete the installation of 27,000m² Geosynthetic Clay Liner at Albion Landfill Site. Due to the time of year, the works were scheduled intermittently to coincide with favourable weather conditions. Our highly experienced Lining Division worked closely with our client to ensure [...]
Concrete Shaft Remediation, Coventry
Julie2018-10-23T00:10:44+01:00Concrete Shaft Remediation, Coventry Due to settlement of the Landfill, previously installed Boot Details had become torn, resulting in Oxygen ingress. We excavated around the existing liner / boot detail, extended the boot detail and installed a Fernco seal.
Odour Control Project, Lancashire (Phase 2)
Julie2018-10-23T14:23:41+01:00Odour Control Project, Lancashire (Phase 2) Following works carried out under Phase 1 of this project, one area of site remained susceptible to H²s outbreak. The uncapped area was an extremely steep banking. Lining of the steep descent presented a challenge in terms of designing a method of installation that ensured [...]
Odour Control Project, Lancashire (Phase 1)
Julie2018-10-23T13:20:21+01:00Odour Control Project, Lancashire (Phase 1) Following installation of a Gas Collection System for the site's Gas Operators, we were requested to provide assistance with odour control issues encountered by our client as a result of an aggressive H²s outbreak. We conducted an assessment of the source and current extent of the [...]
Digestate Lagoon Remediation, Enfield
Julie2018-10-23T00:13:32+01:00Digestate Lagoon Remediation, Enfield We redesigned the Gas Extraction System to the Digestate Lagoon. The existing system had central extraction points for the Gas, within the floating cover. We designed and installed a new Ring main Extraction System to the outer edge of the floating cover. We were recommended to our client for these [...]
Capping Project, Ling Hall, Coventry.
Julie2018-10-20T17:28:15+01:00Capping Project, Ling Hall, Coventry Installation of 27,000m² 1mm LLDPE capping. As part of the ongoing restoration works to Ling Hall Landfill site, Landfill Projects were commissioned by G A Smith to carry out the capping works. 27,000m² 1mm LLDPE Capping. 11No. Gas Well Boot Details. 3No. Concrete Shaft Boot Details. [...]
Landfill HDPE Lining, Northern Ireland
damian2017-03-21T10:56:04+00:00Landfill HDPE Lining, Northern Ireland Our Lining team have installed 7,000m of LLDPE on the Permanent Capping System and 9,500m of Temporary Capping.