HDPE Gas Main Diversion, Newcastle
Landfill projects were contracted by Suez to complete the following works;
- Butt Fuse 170m of 250mm Pipe,
- Butt Fuse 70m of 90mm Pipe,
- Installed 2no Road Crossings,
- Installed Butt fused pipe through Road Crossings and connected to Valve and Knockout Pot.